Unit tariff costs in fixed 2011 value.

     
Area/service  Unit  Operating*cost 2011  Capital cost **  2011-2028   
Area A NOK/scm 0.0319132 0.0670911
Area B NOK/scm 0.0037320 0.0414601
         
Area C Services 
Area C -EXT NOK/scm 0.0202679 0.1194751
Area C - ETSL NOK/tonne 266.8392420 275.3708823
Area C - FSL NOK/tonne 150.2876249 365.8132114
Area C - CSL NOK/tonne 103.4688345 5.2591687
Area C - CO2-R NOK/tonne 225.9409825 267.1898023
Area C - CO2-K/B NOK/tonne 225.9409825 142.2173505
Area C - H2S NOK/kg 120.5748859  
 
Area D - entry points 
Kollsnes NOK/scm 0.0228623  
Kårstø NOK/scm 0.0287851
Oseberg NOK/scm 0.0287851
Nyhamna NOK/scm 0

Other entries

Area D – H2S

Area D – CO2

NOK/scm

NOK/kg

NOK/Tonne

0.0050937

1184.5730028

177.6859504

         

 

Area D - exit points 

UK & Continental exits NOK/scm 0.0203996 0.0666144  
Norwegian exits NOK/scm 0.0203996 0.0006337

 

Area E 

 

NOK/scm

 

 0.0398366

 

0.0533058

Area E – H2S   NOK/kg  

 1184.5730028

 

Area E – CO2

 

Area F 

NOK/Tonne

 

NOK/scm

 

 

0.0266622

177.6859504

 

0.0710744

 
Area G NOK/scm 0.0036818 0.0176501
 
Area H NOK/scm 0.0157858 0.0414601
 
Area I NOK/scm 0.0072331 0.0479752
 

 

* Operating cost is calculated annually on the basis of operating expenses.
** Capital cost is escalated every year in line with Norwegian consumer price index.
Capital cost consists of the K and I elements of the tariff formula. Interruptible capacity tariff is 50% of the sum of operating and capital cost.

 

Further information about the booking and tariff regime (in Norwegian).

 

Download Gassled Tariff View 2003-2011 (PDF).